logo-birawa
Sub Menu

What We Do
So far...

Our Journey

Our Services Portfolio

Various Services

Download List

INSPECTION Services

September 2025-PRESENT-ON GOING
51.

STAR ENERGY KAKAP Ltd

Inspection Services of PAUT and UT at KF Platform Offshore Natuna

  • End User : STAR ENERGY KAKAP Ltd

Hottap - Stopple Services

July 2025
50.

PT. CHANDRA ASRI PETROCHEMICAL Tbk

Hot Tap Stopple Blow Down Down Line High Temperature

  • End User : PT. CHANDRA ASRI PETROCHEMICAL Tbk

Construction Services

March 2025-SEPTEMBER 2025
49.

Gandhi Automations Pvt Ltd

Assembly, Installation, Modification, Erection of 153 meter width, 23 meter height Aircracft Hangar Door include provide Heavy Machinery, Consumable, Equipment Tools at GMF Hangar 1

  • End User : GARUDA MAINTENANCE FACILITY-GMF AERO ASIA Tbk

Manpower Supply

September 2024-PRESENT-ON GOING
48.

MCC15 Engineering-Construction

Manpower Supply 6G GTAW-SMAW Carbon and Stainless Steel, GMAW Welders, 2G-3G SMAW, Riggers total 122 Personnel for PROCESS EXPANSION BATU HIJAU PROJECT at AMMAN Mineral Nusa Tenggara

  • End User : AMMAN MINERAL NUSA TENGGARA-AMNT

Manpower Supply

April 2024-July 2024
47.

STAR ENERGY KAKAP Ltd

Manpower Supply OFFSHORE of Project Supervisor, Welders, Pipe Fitters, Rigger-Scaffolders and Consumable Support for KF Field

  • End User : STAR ENERGY KAKAP Ltd

Manpower Supply

January 2024-July 2024
46.

STAR ENERGY KAKAP Ltd

Manpower Supply OFFSHORE of Welders and Pipe Fitter and Tools Equipment for Supporting Kakap TSS

  • End User : STAR ENERGY KAKAP Ltd

Manpower Supply

October 2023-PRESENT-ON GOING
45.

MCC15 Engineering-Construction

Manpower Supply 6G GTAW-SMAW Carbon and Stainless Steel, GMAW Welders, 2G-3G SMAW total 50 Personnel for AMMAN Mineral Nusa Tenggara SMELTER Project

  • End User : AMMAN MINERAL NUSA TENGGARA-AMNT

Flange Facing

November 2023
44.

PT. INTAN PRIMA KALORINDO

On-Site Tube Sheet Portable Flange Facing

  • End User : PERTAMINA

Manpower Supply

May 2023
43.

RIM METALINOX

Manpower Supply Overseas Project - Welder & Fitter Mauritania-Africa Onshore Project

  • End User : RIM METALINOX

Machining

May 2023
42.

RSKD DUREN SAWIT

Kohler and Deutz Genset Maintenance

  • End User : RSKD DUREN SAWIT

Onsite Calibration

April 2023
41.

PT. AMMAN MINERAL NUSA TENGGARA

Onsite Calibration 15 pcs Flow Meter at Sumbawa

  • End User : PT. AMMAN MINERAL NUSA TENGGARA

Flange Facing Services

Nov - Dec 2022
40.

PT.MEINDO ELANG INDAH

Flange Facing 0.5" up to 6" 150#-900# 19 Pieces Total

  • End User : PT.MEINDO ELANG INDAH

In Situ Machining

Nov - Dec 2022
39.

PT.MULTI NITROTAMA KIMIA

In Situ Machining Tire Predyer, Tire in and Out, 2 Step Machining During Online Condition.

  • End User : PT.MULTI NITROTAMA KIMIA

Rope Access Service

March - April 2021
38.

PT.YAD MULTISERVICES INDONESIA

Maintenance & Installation The Energy Building

  • End User : PT. Api Metra Graha

Hottap Service

December 2021
37.

PT. CHANDRA ASRI PETROCHEMICAL Tbk

Provide Hottaping Services 16" 1 Spot | Cilegon

  • End User : PT. CHANDRA ASRI PETROCHEMICAL Tbk

Hottap Service

November 2020
36.

PT. GLOBAL HEATERINDO

Provide Hottaping Services 6" X 4" 2 Spot | Cilegon

  • End User : PT. CHANDRA ASRI PETROCHEMICAL Tbk

Welding Service

September - December 2020
35.

PT. ASUKA ENGINEERING INDONESIA

Fabrication Fit Up and Welding Service | Cilegon

  • End User : PT. ASUKA ENGINEERING INDONESIA

On Site Calibration Service

September 2020
34.

PT. SUPERIOR ENERGY SERVICES INDONESIA

Moment Motor Torque Engine Calibration

  • End User : PT. SUPERIOR ENERGY SERVICES INDONESIA

Manpower Supply

July - August 2020
33.

PT. MEINDO ELANG INDAH

Manpower Supply - 96 Personnel (Welders,Fitter,Riggers,Scaffolder,Field Joint Coating HSS-HDPUF) for Offshore Pipeline 16" GMAW-FCAW and 6" FULL SMAW Downhill Pipeline Piggyback Welding (Dual Line) | Offshore Gresik-Lamongan

  • End User : PGN SAKA

Manpower Supply

June - July 2020
32.

PT. MEINDO ELANG INDAH

Manpower Supply - 76 Personnel (Welders,Fitter,Riggers,Scaffolder,Field Joint Coating HSS-HDPUF) for Offshore Pipeline 16" GMAW-FCAW - JAWA-1 PLTGU | Offshore Cilamaya

  • End User : PERTAMINA POWER

Manpower Supply

May - July 2020
31.

PT. MEINDO ELANG INDAH

Manpower Supply - 72 Personnel (Welders,Fitter,Riggers,Scaffolder,Painter-blaster,Construction Supervisor) for Pipeline and Top Side Jacket Installation - KLD New Field Development Project | Offshore

  • End User : PHE-ONWJ

Welding Habitat

December 2019
30.

PT. MEINDO ELANG INDAH

Provision of Rental 3 Unit Welding Habitat and 3 Technician for KLB Platform Offshore - Phase 2

  • End User : PHE-ONWJ

PWHT Service

December 2019
29.

PT. MEINDO ELANG INDAH

(PWHT) Services - Post Weld Heat Treatment Services - Carbon Steel Pipe 12" Sch 120, Offshore KLB Platform

  • End User : PHE-ONWJ

On Site Calibration Service

August 2019
28.

PT. SUPERIOR ENERGY SERVICES INDONESIA

Calibration Services of 1 Set Torque Machine

  • End User : PT. SUPERIOR ENERGY SERVICES INDONESIA

Welding Habitat

May - July 2019
27.

PT. MEINDO ELANG INDAH

Provision of Rental 3 Unit Welding Habitat and 3 Technician for KLB Platform Offshore - Phase 1

  • End User : PHE-ONWJ

Rope Access Service

March - April 2019
26.

PT. SULFINDO ADIUSAHA

Rope Access Services - Cleaning 2 Unit Tank Sprayer Hydrant

  • End User : PT. SULFINDO ADIUSAHA

Manpower Supply

January - February 2019
25.

PT. MEINDO ELANG INDAH

Manpower Supply - 28 Welders, 4 Pipefitter, 2 Internal Clamp Operator for YY PROJECT, 13,5 KM Offshore Pipeline, Welding Process GMAW | RMD | STT | For Root - Filler Capping FCAW Semi Automatic | Offshore

  • End User : PHE-ONWJ

Rope Access Service

January - February 2019
24.

SIEMENS GAMESA

Rope Access Services - Wind Turbine Maintenance Phase 3 - Jeneponto Sulawesi

  • End User : SIEMENS GAMESA

Hottap Service

December 2018
23.

PT. KALTIM PARNA INDUSTRI

Provide HotTap Services - Pipe Line Condenser 2" - 4" - Kalimantan

  • End User : PT. KALTIM PARNA INDUSTRI

Rope Access Service

November 2018
22.

SIEMENS GAMESA

Rope Access Services - Wind Turbine Maintenance Phase 2 - Jeneponto Sulawesi

  • End User : SIEMENS GAMESA

Manpower Supply

November 2018
21.

PT. MEINDO ELANG INDAH

Manpower Supply - 28 Welders, 4 Pipefitter, 2 Internal Clamp Operator for Pipe Repair Replacement Project-PRRP, 15 KM Offshore Pipeline, Welding Process GMAW | RMD | STT | For Root - Filler Capping FCAW Semi Automatic

  • End User : PHE-ONWJ

Hottap Service

October 2018
20.

PT. EKA DWI JAYA

Jasa Hot Tap Services - 1-1/2" | 3/4" - Balikpapan

  • End User : PT. EKA DWI JAYA

Rope Access Service

October 2018
19.

PT. ALE HEAVYLIFT

Rope Access Services - Wind Turbine Maintenance Phase 1 - Jeneponto Sulawesi

  • End User : SIEMENS GAMESA

Welding Services

August 2018
18.

PT. MEINDO ELANG INDAH

Welding Procedure Specification (WPS) GMAW | RMD | STT | For Root - Filler Capping FCAW Semi Automatic for PRRP (Pipe Repair and Replacement Project) PHE ONWJ -Balaraja Yard

  • End User : PHE-ONWJ

Welding Service

July 2018
17.

PT. MEINDO ELANG INDAH

Welding Procedure Specification SMAW-Downhill-Uphill-for KK (Kedung Keris) Exxon Mobile Project

  • End User : EXXON MOBILE

PWHT Service

July 2018
16.

PT. VH BOILER AND ENERGY

(PWHT) Services - Post Weld Heat Treatment Services - Kalimantan Tengah

  • End User : PT. VH BOILER AND ENERGY

Overhaul Service

May 2018
15.

PT. KALTIM METHANOL INDUSTRI

Repair and Calibration of Injection Pumps and Turbo Chargers

  • End User : PT. KALTIM METHANOL INDUSTRI

Overhaul Service

May 2018
14.

PT. KALTIM METHANOL INDUSTRI

General Overhaul Deutz Engine

  • End User : PT. KALTIM METHANOL INDUSTRI

Insitu Machining Service

May 2018
13.

PT. VALMET TECHNOLOGY CENTER

IN SITU Machining Bore Hole

  • End User : PT. VALMET TECHNOLOGY CENTER

Manpower Supply

April 2018 - April 2019
12.

PT. INDOTECH KARYA MANDIRI

Manpower Supply Riggers and Banksman for BP Tangguh LNG Expansion Project (Train 3) West Papua | Onshore

  • End User : CSTS

Manpower Supply

February 2018
11.

PT. MEINDO ELANG INDAH

Manpower Supply - 28 Welders, 4 Pipefitter, 2 Internal Clamp Operator for SP New Field Development Project 11.5 KM Offshore Pipeline, Welding Process GMAW | RMD | STT | For Root - Filler Capping FCAW Semi Automatic | Offshore

  • End User : PHE-ONWJ

WHCP Service

February 2018
10.

PT. MEINDO ELANG INDAH

Well Head Control Panel | WHCP Flushing Services Handil Kaltim | Onshore

  • End User : PHE-ONWJ

Insitu Machining Service

January 2018
09.

PT. MULTI NITROTAMA KIMIA

In-SITU Machining - PITCH RING Services

  • End User : JICT

Welding Service

October 2017
08.

PT. MEINDO ELANG INDAH

Welding Procedure Specification (WPS) GMAW | RMD | STT | For Root - Filler Capping FCAW Semi Automatic for SP Project - Balaraja Yard

  • End User : PHE-ONWJ

Rope Access Service

July 2017
07.

PT. TAHTA LAKSANA

Rope Access Services - IRATA Certified Personnel-Bunker Visual Inspection

  • End User : PT. MERAK ENERGI INDONESIA

Rope Access Service

February 2017
06.

PT. BIRO KLASIFIKASI INDONESIA

Rope Access Services - Crane Inspection with Rope Access Technician IRATA Certified Personnel-RIG Inspection (Halliburton Site) Silangit-North Sumatera

  • End User : Halliburton

Rope Access Service

January 2017
05.

PT. AUS NDT

NDT Services - Crane Inspection with Rope Access Technician IRATA Certified Personnel-PELINDO PORT TJ. PRIOK Jakarta

  • End User : PELINDO

Welding Service Service

March 2016
04.

PT. LF BEAUTY MANUFACTURING INDONESIA

Tank Repiar Check Double Jacket

  • End User : PT. LF BEAUTY MANUFACTURING INDONESIA

Piping Service

May 2016
03.

PT. LOGOS CONSTRUCTION

Pipe Repair at PLTA Kracak

  • End User : PERTAMINA POWER

Welding Service

April 2016
02.

STAMGAZSTROY

Welder Performance Qualification for Kazakhstan Construction Project

  • End User : STAMGAZSTROY

Rope Access Service

March 2016
01.

PT. BIRO KLASIFIKASI INDONESIA

NDT Services - Crane Inspection with Rope Access Technician IRATA Certified Personnel-JAKARTA CRANE INTERNATIONAL TERMINAL-JICT PORT TJ. PRIOK Jakarta

  • End User : JICT

Our Goods Portfolio

Various Goods

Supply PPE

2015-2017
01.

PT. GEO DIPA ENERGI

Supply Bulk of PPE (Protective Apparel)Safety Helmet, Coverall, Safety Glasses, Ear Muff, Redwing Safety Shoes, Rain Coat

Supply Material

2016-2017
02.

PT. BUKAKA TEKNIK UTAMA

Supply Valve and Consumable

Supply Proximity Switch

2016-2017
03.

PT. NUSANTARA REGAS

Supply Proximity Switch

Supply PPE

2017
04.

SEADRILL

Supply Bulk of PPE for Offshore Drilling offshore personnel

Supply PPE

2017-2022
05.

PT. KSB INDONESIA

Supply Bulk of Coverall

Supply Safety

2022
06.

HERMINA HOSPITAL GROUP

Supply Safety Equipment & Cleaning Equipment

Supply Safety

2022
07.

PT, TUKANG BERSIH INDONESIA

Supply Safety Equipment & Cleaning Equipment

Ready to order your project ?

Some of Our Clients

PT. BIRAWA ADHI PRATAMA

Indonesia Manpower Recruitment Agency and Rope Access Services